Case Study · Custom Home Construction · In Progress

Ground-up CBS custom home — Tampa.

A ground-up custom home build captured through the structural phase — site prep, footings, concrete-block (CBS) wall construction, and ZIP-system framing. Documentation continues through completion.

ScopeNew Build
SystemCBS
Photos31
StatusActive
Project Overview

Ground-up on a Tampa lot — CBS construction.

A new single-family custom home going up on a Tampa lot, engineered to Florida Building Code for the local wind-borne debris region. The structural system is concrete block (CBS) walls with poured-concrete tie beams and hurricane straps at every intersection — Florida's proven answer to hurricane loading and pest-resistance in one system.

The exterior wall assembly transitions to ZIP-system wood framing at the second story, with pre-primed sheathing and taped seams for a continuous air and water barrier. Structural inspections passed at footing, block, and framing stages.

This case study is in progress. As we hit each construction milestone — dry-in, MEP rough-in, finish selections, and final walkthrough — we'll add the phase to this page.

Chapter 01

Site prep, footings, and slab.

Existing site cleared, staked, and graded to plan. Trenches for perimeter footings dug and inspected. Rebar cage tied and floor slab poured to Florida Building Code minimum for the wind zone.

Site prep with block staged
Foundation rebar cage
Slab pour
Chapter 02

CBS walls going up.

Concrete blocks laid course by course with rebar and grout in cells at every corner and window opening. Poured tie beam at the top of the wall locks the assembly to the roof structure.

CBS block laid at courses
Corner detail with rebar cells
CBS walls near tie-beam height
Chapter 03

ZIP-system framing at the second story.

Wood-frame second story built on top of the CBS first-floor tie beam, sheathed with ZIP-system panels that combine structural sheathing with a built-in weather-resistive barrier. Seams taped for a continuous air and water barrier.

ZIP-system sheathing
Framing detail
Framing near dry-in
In Progress

This case study is live — we add photos as we build.

Next milestones on the roadmap: dry-in inspection, mechanical / electrical / plumbing rough-in, insulation and drywall, interior finish, exterior finish, and the certificate of occupancy walkthrough. We publish photos as each phase closes.

Start a Project

Thinking about a custom home?

Every custom home starts with a lot walk and a conversation about how you want to live in the space. Tell us about yours.

Request a Consultation
Verify license CGC062538  ·  Licensed & Insured  ·  Serving Tampa Bay Since 2009  ·  (813) 999-5910