Mason Homes serves Sun City Center homeowners with full-scope residential construction — kitchens, baths, whole-home renovations, additions, ADUs, and ground-up custom builds.
Sun City Center is a 55+ active-adult community in southern Hillsborough County, one of the largest of its kind in Florida. Housing stock spans 1962 (original Sun City development) through brand-new construction in Renaissance and the eastern expansion. Homes range from compact 1960s villas to spacious 2,500+ sq ft single-family homes in Kings Point and Renaissance.
Sun City Center has one of the most active aging-in-place remodel markets in Tampa Bay. Common project types: primary-bath conversions to walk-in showers with grab bars and bench seating, kitchen updates with raised-height countertops, doorway widening for wheelchair access, and floor-leveling between rooms. Scope sizes are typically smaller than affluent suburbs (villa/patio-home footprints), often at the lower end of the metro ranges shown below — but volume is high.
Sun City Center is technically a community-owned residential association with its own design review process for exterior work. Many remodel projects involve coordinating with the SCC Community Association in addition to standard Hillsborough County permits. The market for accessibility-focused remodels is unusually concentrated here.
We handle every part of the permit process — applications, inspection scheduling, sub-permits across electrical/plumbing/mechanical, and final certificate of occupancy. The homeowner's only role is to be present (or arrange access) for inspections.
The ranges below reflect typical Sun City Center projects in 2026. Far suburban projects can run 5–15% lower; premium-finish work can run higher. Every project we estimate gets a line-item written quote based on the specific scope after an on-site visit.
| Project Type | Cost Range | Timeline | Cost Guide |
|---|---|---|---|
| Bathroom remodel | $15,000 – $35,000 | 3–6 weeks | View guide |
| Kitchen remodel | $30,000 – $80,000 | 5–10 weeks | View guide |
| Whole-home renovation | $150,000 – $400,000+ | 4–9 months | All guides |
| Home addition | $80 – $300/sq ft | 3–8 months | View guide |
| Detached ADU | $80,000 – $250,000 | 4–8 months | View guide |
| Custom home | $150 – $400+/sq ft | 8–14 months | View guide |
Tell us about your home and what you're planning. We'll follow up to arrange an on-site consultation.
Start a Project →